Austin American-Statesman – Feb. 3, 2017

Starting Friday, a portion of FM 969 — the East Martin Luther King Jr. Boulevard bridge over U.S. 183 — will be reduced to one lane in each direction between Tannehill Lane and Regency Drive.

Drivers passing through this interchange may experience increased travel delays.The lane reduction will last for about the next six months, so that a wider bridge at U.S. 183 can be

constructed, according to the Central Texas Regional Mobility Authority.

This is part of the 183 South Project, which began in April 2016 and is expected to be complete in

2019.

The $743 million project plans to add a new tolled expressway, improve the non-tolled U.S. 183, add

a high-tech traffic monitoring system, add miles of bicycle lanes and sidewalks and upgrade the visual

appearance.

Work on the MLK Boulevard bridge is expected to be completed in late 2017.

http://www.statesman.com/news/local/lanes-reduced-mlk-blvd-183-bridge-widened/kICiAM8I8alNm9Cb6Gx4FJ/ 

 

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s